Bocimi Toll Road Section II Can Speed Up Jakarta to Sukabumi Trip

Presiden Jokowi Resmikan Tol Bocimi Seksi II
Sumber :
  • Antara

Jakarta – The Indonesian President Joko Widodo (Jokowi) inaugurated Section II Cigombong-Cibadak of the Bogor-Ciawi-Sukabumi (Bocimi) Toll Road on Friday. This toll road has length 11.90 kilometers in the West Java Province. 

Bali Mandara Toll Road Becomes Pilot Project for Tapless Payment System

"Alhamdulillah, the Cigombong-Cibadak section that has length 11,9 kilometers already done and ready to operate soon," the Head of State said after inaugurating the toll road section in Sukabumi, West Java, on Friday. 

This toll road costs IDR 3.2 Trillion and is expected to cut the travel time from Jakarta to Sukabumi to only 2.5 hours.

Tapless Payment on Toll Road to Begin by End of 2024

Presiden Jokowi, Menteri PUPR Basuki Hadimuljono dan Gubernur Jabar Ridwan Kamil

Photo :
  • ANTARA/Desca Lidya Natalia

"The Cigombong-Cibadak section will speed up travel from Jakarta to Sukabumi, usually taking 5 hours, to 2.5 or two hours," President remarked. 

Jokowi Orders MLFF Implementation, Tapless Payment on Toll Road

President noted that earlier, in some cases, the travel time could reach 6 to 9 hours due to traffic congestion caused by markets, among other factors, "I experience it myself once (a trip that took) almost 6 hours,"

Jokowi stated that with the presence of the toll road section, traffic congestion could be avoided.

He further highlighted that the toll road section would speed up the mobility of people and goods, cutting short the travel time to several tourist destinations in Sukabumi, such as Pelabuhan Ratu, Ciletuh Geopark, and Ujung Genteng.

"This (the inauguration) is a gift for West Java Province, especially Sukabumi, on the occasion of Indonesia's 78th independence anniversary," President Joko Widodo said. 

On that occasion, he also instructed that Section III and Section IV of the Bocimi Toll Road be completed at the earliest.

The Bocimi Toll Road has four sections, with a total length of 54 km. Section I Ciawi-Cigombong has a length of 15.35 km and has been operating since December 2018.

The 11.90-km-long Section II Cigombong-Cibadak was previously operated during the Eid al-Fitr homecoming exodus period from April 15, 2023, to May 1, 2023.

Meanwhile, Section III Cibadak-Sukabumi, with a length of 13.70 km, and Section IV West Sukabumi-East Sukabumi, with a length of 13.05 km, are still in the land acquisition process.

The presence of the toll road section is expected to facilitate connectivity to support the people's economy, including the industrial, goods, and service sectors, as it will be connected to the southern part of West Java, such as Bogor and Ciawi.

Olah TKP kecelakaan beruntun di KM 92 Tol Cipularang

Massive Collision Involves 21 Vehicles at Cipularang Toll Road

A multi-vehicle crash involving a truck and several other vehicles occurred on Monday on the Cipularang Toll Road in West Java, Kilometer 92, heading toward Jakarta.

img_title
VIVA.co.id
12 November 2024